Do Not Sign Until the Fibre Does: A Connectivity Due-Diligence Checklist for Office Moves
A new lease can be signed long before the broadband is ready. This scored checklist helps UK SMEs test broadband, leased-line and VoIP readiness at a prospective office, covering lead times, wayleaves, notice periods, number porting and contingency. It is designed to be used before the lease commitment, not after the removal van arrives.